BAT Conclusions for Your Sector: Where to Start
BAT conclusions set the emission limits and operating conditions for installations that hold an integrated environmental permit. We explain where they come from, which deadlines apply and how to check whether your plant complies.
CONTENTS
IN SHORT
- BAT conclusions are a binding extract of the BREF reference documents, published as a European Commission implementing decision.
- Once they are published, the authority reviews the permit and the installation has at most 4 years to comply.
- In December 2026 the deadlines expire for the textile industry and for waste gas treatment in the chemical sector.
What BAT conclusions are
BAT are the best available techniques: solutions that reduce emissions and resource use in a given sector and can also be applied under reasonable technical and economic conditions. They are described in the BREF reference documents, very long texts that the European Commission draws up together with industry, the Member States and environmental organizations.
BAT conclusions are the most important part of a BREF. Unlike the full document, they are legally binding: the Commission publishes them as implementing decisions in the Official Journal of the EU. Among other things, they include the emission levels associated with BAT (BAT-AELs), the monitoring requirements and a description of the techniques that can achieve those levels.
How BAT conclusions make their way into the permit
When the Official Journal of the EU publishes the BAT conclusions for an installation’s main activity, the competent authority of the autonomous community reviews the integrated environmental permit. Under Article 26.2 of the consolidated Law on integrated pollution prevention and control (Royal Legislative Decree 1/2016), within four years of publication it has to ensure that the permit conditions have been reviewed and, where necessary, updated, and that the installation complies with them. To do so, the authority asks the operator for the information it needs.
Four years sounds like a long time. In practice, part of it goes on the administrative procedure itself. If compliance requires a new installation, for example to treat waste gases, there is little time left for design, tendering, construction and start-up.
Upcoming deadlines
Deadlines run from the date of publication in the Official Journal of the EU. These are some sectors where the compliance period is still open or about to end:
- Common waste gas management and treatment systems in the chemical sector (WGC): published on 12 December 2022; compliance by 12 December 2026.
- Textile industry (TXT): published on 20 December 2022; compliance by 20 December 2026.
- Slaughterhouses and animal by-products industries (SA): published on 18 December 2023; compliance by 18 December 2027.
- Smitheries and foundries (SF): published on 6 December 2024; compliance by 6 December 2028.
In many sectors the deadlines have already passed: in ferrous metals processing (FMP) on 4 November 2026, in surface treatment using organic solvents (STS) on 9 December 2024, and in the food, drink and milk industries (FDM) on 4 December 2023. Those installations should already meet the BAT requirements. The European IPPC Bureau (EIPPCB) publishes all BREF documents and BAT conclusions with their dates.
What changes with IED 2.0
The revision of the Industrial Emissions Directive strengthens the role of the conclusions. The authority will have to set the strictest emission limits each installation can achieve, not just any value within the BAT-AEL range. The permit will also include environmental performance levels for water, energy and raw materials. We explain this in detail in the article on IED 2.0.
Where to start: four steps
- Find out which BAT conclusions apply to you. This depends on the installation’s main activity. Each set of conclusions also refers to others that may be relevant, for example on energy efficiency or emissions monitoring.
- Compare your current results with the BAT-AELs. You need recent measurements of emissions to air and water. If you don’t have them, or they are old, start by measuring.
- Identify the gaps. For each requirement, determine whether the installation complies, partly complies or needs technical changes.
- Choose the techniques and estimate the costs. The conclusions usually offer several techniques to choose from. The cheapest one to buy is not always the cheapest one to run.
In practice, this analysis is a benchmarking exercise. At WIZZUM we base it on the BAT conclusions and the BREF documents. You can read more in the description of our services.
Conclusion
BAT conclusions are not recommendations. They are mandatory requirements with specific deadlines. The sooner a plant compares its results with the BAT-AELs, the more time it has to choose a technique carefully and carry out the investment.
Frequently asked questions
How do BAT conclusions differ from the BREF document?+
The BREF is a long reference document for a whole sector. The BAT conclusions are its most important part, adopted as a European Commission implementing decision and binding when integrated environmental permits are granted.
How long does a plant have to comply with BAT conclusions?+
At most 4 years from publication of the conclusions in the Official Journal of the EU. Within that period, the competent authority has to review the permit and the installation has to meet the new conditions.
Where can I check the deadlines for my sector?+
The European IPPC Bureau (EIPPCB) publishes all BREF documents and BAT conclusions with their dates on its website. The texts of the decisions are on EUR-Lex.
Sources
AUTHOR
WIZZUM engineering teamWe design and commission wastewater and gas treatment installations for industry, from benchmarking and FEED engineering to start-up.
NEED HELP?
Do you want to compare your plant's results with the BAT conclusions?
- Comparative technical analyses
- Design and delivery of turnkey installations
- Environmental benchmarking and BAT analysis
Read also
21/07/2026
Industrial Emissions Directive 2.0: What It Means for Your Plant
What IED 2.0 changes in integrated environmental permits: the strictest achievable emission limits, the environmental management system, transformation plans and penalties.
Read the article →
27/02/2024
RTO, RCO or biofilters: comparing VOC treatment technologies
Efficiency, operating temperature, energy use and maintenance of the three most widely used technologies, and how to choose the right one for your plant.
Read the article →
19/09/2023
Air and gas measurements: emissions, odors and noise
Air and gas measurements help you control emissions, improve air quality and comply with regulations.
Read the article →
OFFICE
Avda. Cabrera, 36
08302 Mataró (Barcelona), Spain
info@wizzum.com
© 2026 Wizzum. All rights reserved.