Solvent emissions in Europe: what the rules require and how they apply in Spain and France
A stack limit, a fugitive emission limit and an annual solvent balance: the three obligations are the same across the European Union. We explain how to meet them and what changes between Spain and France.
CONTENTS
IN SHORT
- Any plant above the consumption threshold for its activity has three obligations: a stack limit, a fugitive emission limit and an annual solvent balance.
- The underlying limits are the same in Spain and France. What changes is the consumption from which the rules apply, the paperwork and the room for the reduction scheme.
- Above 150 kg/h or 200 t/year the BAT conclusions of the STS BREF are added, with limits for NOx, CO and energy use as well.
Who it applies to
The common rule is in Chapter V and Annex VII of Directive 2010/75/EU on industrial emissions. It applies to the activities listed in Part 1 of the annex that exceed the solvent consumption threshold in Part 2.
These are the European thresholds and limits for the most common activities. They are minimums: each country can be stricter.
| Activity | Consumption threshold (t/year) | Stack limit (mg C/Nm³) | Fugitive emission (% of solvent input) |
|---|---|---|---|
| Flexography, packaging rotogravure, laminating and varnishing | 15 | 100 | 25 up to 25 t; 20 above |
| Publication rotogravure | 25 | 75 | 10 in new installations; 15 in existing ones |
| Coating of metal, plastic, textile, film and paper | 5 | 100 up to 15 t; above that, 50 in drying and 75 in application | 25 up to 15 t; 20 above |
| Wood coating | 15 | 100 up to 25 t; above that, 50 in drying and 75 in application | 25 up to 25 t; 20 above |
| Adhesive coating | 5 | 50 (150 if the solvent is recovered) | 25 up to 15 t; 20 above |
| Surface cleaning | 2 | 75 | 20 up to 10 t; 15 above |
| Manufacture of paints, varnishes, inks and adhesives | 100 | 150 | 5 up to 1,000 t; 3 above |
The annex also covers heatset web offset, dry cleaning, vehicle and coil coating, footwear, leather, rubber conversion, vegetable oil extraction and the manufacture of pharmaceutical products.
The European legal basis
There are two layers, and it helps to keep them apart.
| Layer | Rule | Who it applies to | What it sets |
|---|---|---|---|
| General | Chapter V and Annex VII of Directive 2010/75/EU, carried over from Directive 1999/13/EC | Any installation above the threshold for its activity, from a few tonnes a year | Minimum limits for stacks and fugitive emissions, the regime for hazardous substances and the solvent management plan |
| Large installations | Implementing Decision (EU) 2020/2009, BAT conclusions of the STS BREF | Installations with a consumption capacity above 150 kg/h or 200 t/year, which need an integrated permit | Emission levels by sector, monitoring, plus NOx, CO, energy and water |
The first layer is a directive: each Member State has transposed it with its own rules, and that is where the differences come from. The second is a Commission decision that applies in the same way everywhere, through each installation’s permit.
In 2024 the directive was amended by Directive (EU) 2024/1785, which Member States had to transpose by 1 July 2026. Its effects are explained at the end.
The three common obligations
Limit in waste gases. This is the maximum VOC concentration in each stack, in milligrams of carbon per normal cubic metre. If the source has abatement equipment and releases more than 10 kg/h of total organic carbon, monitoring is continuous. Otherwise it can be periodic, with at least three readings per measurement.
Fugitive emission limit. This is everything that does not leave through a stack: what escapes through doors, windows and general ventilation, and the solvent that stays in the product. It is expressed as a percentage of the solvent input and it is calculated, not measured.
Solvent management plan. This is the mass balance used to calculate the fugitive emission and to show compliance. The directive gives it three uses: verifying compliance, identifying reduction options and informing the public.
On top of these three there is a regime for the most hazardous substances. It is the same across the EU and applies whichever compliance route is chosen:
| Substances | Limit | From a mass flow of |
|---|---|---|
| With hazard statements H340, H350, H350i, H360D or H360F | 2 mg/Nm³ | 10 g/h |
| Halogenated VOCs with H341 or H351 | 20 mg/Nm³ | 100 g/h |
The directive also requires these substances to be replaced by less harmful ones within the shortest possible time. If your process uses any of them, that comes before any decision about equipment.
How it works on site
The solvent balance
The solvent management plan is bookkeeping. Solvent comes in on one side (I) and goes out on the other (O). The streams are the same in every country because they come from Part 7 of Annex VII.
| Stream | What it is | Where the figure comes from |
|---|---|---|
| I1 | Purchased solvent entering the process, neat or contained in inks, varnishes and adhesives | Invoices and safety data sheets, corrected with opening and closing stock |
| I2 | Recovered solvent reused in the process | Records from the still or the recovery plant |
| O1 | Emission through the stack | Measurements at the sources and operating hours |
| O2 | Solvent lost in water | Effluent analysis |
| O3 | Solvent left as residue in the product | Product tests |
| O4 | Uncaptured emission to air | Not measured: this is what the balance works out |
| O5 | Solvent destroyed or captured in the abatement equipment | Measured efficiency of the oxidiser or the adsorber |
| O6 | Solvent in collected waste | Waste transfer documents and the solvent content of the waste |
| O7 | Solvent sold as part of a product | Formulation and sales |
| O8 | Solvent recovered for reuse outside the process | Recovery records |
| O9 | Solvent released in other ways | Case by case |
Because O2, O3, O4 and O9 are hard to measure, the fugitive emission is calculated by difference:
Fugitive % = F / (I1 + I2) × 100
An example published by the Madrid regional government: an installation with 60.5 tonnes of input and 6.6 tonnes of fugitive emission is at 10.9% (worked examples, in Spanish). It would comply as a flexographic printer, with a limit of 20 or 25%, and not as an ink manufacturer, with 5%.
The compliance routes
The directive offers three, plus a derogation:
- Stack and fugitive limits. Meet both limits at the same time. This is the usual route when there is abatement equipment.
- Total emission. Meet a single limit that adds the two together. It suits plants with good capture.
- Reduction scheme. Reach an equivalent target emission by switching to products with less solvent: water-based inks, UV curing, high solids. It does not require abatement equipment.
- Derogation. For the fugitive limit, where it is shown not to be technically and economically feasible and the best available techniques are being used.
Where it goes wrong
- Purchases do not match consumption. Without stock counts at the start and end of the year, the whole balance error ends up in the fugitive figure.
- Nobody knows how much solvent is in the waste. If it is not analysed, it does not count as an output.
- The efficiency of the equipment is assumed. O5 has to be measured, not taken from the manufacturer’s data sheet.
- Capture is poor. An oxidiser that destroys 99% of what reaches it is of little use if only 70% reaches it. Most fugitive exceedances are solved at the hoods and enclosures.
Spain and France: where they differ
The underlying limits are the same. Four differences really affect a plant: the consumption from which the rules apply, how that consumption is counted, what paperwork has to be submitted and whether the reduction scheme is accepted.
| Spain | France | |
|---|---|---|
| Rule | Royal Decree 117/2003 | Arrêté of 2 February 1998 and the arrêtés setting general requirements |
| From what consumption | The directive’s thresholds | Management plan from 1 t/year of solvent |
| How it is counted | Actual annual consumption | Annual consumption, C = I1 − O8 |
| What is submitted | Annual plan to the regional government; in Madrid, by 31 March | Plan kept available for the inspectorate; above 30 t/year it is sent every year through GEREP |
| Reduction scheme | Yes, with the authority’s agreement and only for some activities | Yes (schéma de maîtrise des émissions), but no longer for installations under BAT |
| Who enforces | Regional governments (comunidades autónomas) | Prefecture and the classified installations inspectorate |
France asks for the management plan from very low consumption. Above one tonne a year you already need one, although it is only sent in every year above 30 (GEREP guidance note, in French). In addition, for installations subject to BAT, reduction schemes stopped being applicable with the arrêté of 3 February 2022.
Spain splits enforcement between regions. There is a single royal decree, but registers, forms and deadlines are regional, and the specific conditions sit in each plant’s permit (Madrid regional government, in Spanish).
For a group with plants in both countries there are two consequences. In France the solvent management plan is required at much lower consumption than in Spain. And a reduction scheme accepted at a Spanish plant may not be valid at a French one that is subject to BAT.
Large installations: what the STS BREF adds
Above 150 kg of solvent per hour or 200 tonnes a year of consumption capacity, the installation needs an integrated permit and the BAT conclusions of Decision (EU) 2020/2009 apply, the same across the EU. Member States had four years from publication, in December 2020, to bring permits into line (ESIG). We explain how those conclusions work in BAT conclusions for your sector: where to start.
| Aspect | Annex VII of the directive | BAT conclusions (STS) |
|---|---|---|
| What is limited | VOCs in stacks and fugitive emissions | Total and fugitive VOCs by sector, plus NOx, CO and dust |
| Solvent balance | To verify compliance | At least once a year, as a mandatory monitoring technique |
| Stack monitoring | Continuous above 10 kg/h of carbon; periodic otherwise | Once a year below 10 kg C/h; continuous from there up |
| Energy and water | Not covered | Consumption levels associated with BAT |
Two practical consequences. The thermal oxidiser now has limits of its own: the conclusions associate 20 to 130 mg/Nm³ of NOx with BAT and give an indicative level of 20 to 150 mg/Nm³ of CO. An old unit that destroys VOCs well can fail because of the gases from its own burner.
And energy becomes part of the assessment. For flexography and packaging rotogravure, the conclusions give a reference of 50 to 350 Wh per square metre printed. Treating more air than necessary is no longer just a cost.
Where it is heading
The underlying change comes from Directive (EU) 2024/1785, which we summarise in Industrial Emissions Directive 2.0. Member States had to transpose it by 1 July 2026 and not all have done so: in Spain the law is still going through as a preliminary draft (Junta de Andalucía, in Spanish).
For an installation with an integrated permit, the reform brings the following, according to the analysis of the Spanish draft published by Gómez-Acebo & Pombo:
- Limits at the demanding end of the range. The authority will set the strictest values within the range associated with BAT, unless the operator shows they are not feasible. The Commission has clarified that this is not automatic (communication analysed in October 2026), but the burden of justifying it shifts to the company.
- A mandatory environmental management system, with periodic external audits.
- A transformation plan for 2030–2050, indicative, on how the installation will reach a carbon-neutral and circular activity.
- Performance levels for resource consumption. Those for water will be binding.
- Penalties that, for the most serious infringements, must be able to reach at least 3% of annual turnover in the EU.
- Timing. The new obligations will apply to existing installations as new BAT conclusions are published.
Beyond the legal text, there are four trends on which the rules, the authorities and the industry agree:
- Reduce at source before treating. The reduction scheme already rewarded this and BAT puts it first: water-based inks, UV curing, high solids.
- Count the whole emission, not just the stack. The conclusions talk about total and fugitive emissions. The solvent balance goes from an annual formality to a control tool.
- Treat with less energy. Concentrating before oxidising, recovering heat and replacing natural gas respond to the fact that the oxidiser’s energy use and NOx are assessed too.
- Recover the solvent where possible. It fits the directive’s circular economy objective and, with a single solvent and a high load, it usually pays.
The European solvents industry regards the STS BREF work as finished and is already looking at the best-techniques projects of the OECD and the United Nations (ESIG), a sign that the European model is being taken as a reference elsewhere.
What to do now
- Place each plant in its country. Annex activity, annual consumption and consumption capacity, using the criteria of the country where it is. That tells you whether only the general rule applies or the STS BREF as well.
- Check the safety data sheets. If any solvent carries H340, H350, H350i, H360D, H360F, H341 or H351, the limits are different and the first step is to look at substitution.
- Close the balance properly. Stock counts at the start and end of the year, analysed solvent content of the waste and measured equipment efficiency.
- Measure the peaks, not the average. The stack limit is exceeded at start-ups and job changes.
- Look at capture before equipment. If the problem is fugitive emissions, the answer is usually in the hoods and enclosures.
- If you are going to invest, size for what is coming. Equipment that only just meets today’s limit may fall short when the permit is reviewed with values at the low end of the range. Compare the options on energy use, NOx emissions and ten-year cost. We cover costs in How much VOC emission treatment costs.
At Wizzum we measure the emission, review the solvent management plan and compare the technologies that fit your data before you ask for quotes. We work across the European Union.
Sources
- Directive 2010/75/EU, Annex VII and Chapter V
- Implementing Decision (EU) 2020/2009, BAT conclusions of the STS BREF (Spanish version)
- ESIG: STS BREF
- Directive (EU) 2024/1785
- Madrid regional government: obligations under Royal Decree 117/2003
- France: guidance note for the Solvants/PGS section of GEREP and arrêté of 3 February 2022
- Gómez-Acebo & Pombo: analysis of the Spanish draft law
This article is for information only and is not a substitute for legal advice on a specific installation.
AUTHOR
WIZZUM engineering teamWe design and commission wastewater and gas treatment installations for industry, from benchmarking and FEED engineering to start-up.
NEED HELP?
Do you want to know whether your plant meets the solvent emission limits?
- Comparative technical analyses
- Design and delivery of turnkey installations
- Environmental benchmarking and BAT analysis
Read also
21/07/2026
Industrial Emissions Directive 2.0: What It Means for Your Plant
What IED 2.0 changes in integrated environmental permits: the strictest achievable emission limits, the environmental management system, transformation plans and penalties.
Read the article →
27/02/2024
RTO, RCO or biofilters: comparing VOC treatment technologies
Efficiency, operating temperature, energy use and maintenance of the three most widely used technologies, and how to choose the right one for your plant.
Read the article →
19/09/2023
Air and gas measurements: emissions, odors and noise
Air and gas measurements help you control emissions, improve air quality and comply with regulations.