Home / Blog / ZLD and water recovery

ZLD AND WATER RECOVERY

Managing liquid waste in industry: when the investment pays back in under 18 months

A worked example: 2 m³ a day of wash water at €200/m³. What investment pays back in under 18 months, how much of the invoice really disappears, and six places in the plant where the same calculation applies.

W
WIZZUM engineering teamPublished on 29/11/2026 · 6 min read

CONTENTS

IN SHORT

  • At 660 m³ a year and €200/m³, off-site disposal costs €132,000. With a vacuum evaporator, the estimated annual cost drops to about €19,000.
  • With €113,000 saved each year, an investment of €150,000 pays back in about 16 months. To stay under 18 months it has to be below €169,500.
  • Before ordering the equipment, run a test on a real sample: recovered water quality, energy consumption and the disposal price of the concentrate.

A plant that generates 2 m³ a day of reactor wash water and pays €200/m³ to have it taken away spends €400 per production day on that stream. Over 330 working days it sends 660 m³ to a waste contractor and pays €132,000 a year. That invoice is the starting point for deciding whether to segregate the washes, recover water on site or install an evaporator.

The example is illustrative. It takes a published vacuum evaporation case as its reference, keeps the disposal cost of €200/m³ and reduces the flow to 2 m³ a day. The figures below are estimates for that scenario.

What investment allows a payback under 18 months

Suppose the plant installs a heat-pump vacuum evaporator and reuses the recovered water in the washes. For a first estimate, electricity and concentrate disposal costs are scaled in proportion to the volume treated. Maintenance is left at €3,000 a year, because part of that cost depends on the equipment installed and on the service schedule.

ItemAnnual estimate
Current off-site disposal of 660 m³€132,000
Disposal of the concentrate after evaporation€6,400
Evaporator electricity€9,600
Maintenance€3,000
Annual cost after the investment€19,000
Estimated annual saving€113,000

With that saving, a total installed investment of €150,000 would be recovered in about 15.9 months of stable operation. To stay under 18 months, the investment would have to be below €169,500. The calculation assigns no saving to water reuse. That benefit could be added if production can show what volume of purchased water it replaces and at what cost.

The margin deserves a look. An investment of €150,000 needs to save more than €100,000 a year to pay back in under 18 months. That leaves €13,000 a year to absorb items not yet quantified, such as labour hours, cleaning chemicals or collections during shutdowns. If those extra costs reach €13,000, the payback becomes exactly 18 months.

How much of the invoice will really disappear

The first step is to cross-check twelve months of invoices, weighbridge tickets and production records. When the haulier charges per trip, reducing volume only saves on logistics if collections are cancelled. When the waste contractor invoices per tonne and the supplier sizes the equipment in m³/h, it is worth measuring the density of both the original liquid and the concentrate. Applying the same price to both can change the result considerably.

Before ordering the equipment, three figures should come from a representative sample: the quality of the recovered water, the energy the treatment consumes and what the contractor charges to accept the final residue. In the example, electricity and concentrate were estimated proportionally. A test with the plant’s most difficult washes replaces both assumptions with design data.

Minimisation or zero liquid discharge

Minimisation reduces the amount of waste leaving the factory. Reaching zero liquid discharge (ZLD) also means defining which line or installation is to be closed and settling where the water, the concentrates, the blowdowns and the cleaning streams go. Final concentration and crystallisation can require a considerable amount of energy.

In this example, €6,400 a year of concentrate disposal would remain after evaporation. If a crystalliser is being considered, that is the item that can still be reduced. Even removing it completely, the saving would only justify an investment below €9,600 for the extra stage to pay back in under 18 months. The real threshold would be lower once energy, maintenance and removal of the solid are deducted. If the factory needs ZLD because of discharge restrictions or water scarcity, those reasons have to enter the decision separately.

In Spain, when the stream is legally classed as waste, Law 7/2022 requires the producer to ensure it is treated properly. If the factory takes on that operation, it has to check which permit it needs and where each fraction can lawfully go.

France applies the same rule. Under Article L. 541-2 of the Environmental Code, the producer remains responsible for its waste until final disposal or recovery, even when it hands it over to a third party, and has to make sure that party is authorised to take it.

Six specific applications in the plant

1. Reactor washing

Collecting the first rinse separately from the later ones shows where the carried-over product concentrates. If the last rinse can be used at the start of the next clean, both purchased water and the volume needing treatment go down. It is worth running this test before sizing the evaporator and comparing the washing cost per batch.

2. Machining coolants

If the bath is replaced because fines or tramp oil build up, filtration and separation are worth testing. The saving comes from spacing out collections and buying less fresh concentrate. Production can check it by logging service hours between changes, part quality and tool life.

3. Surface treatment baths

Part of the product leaves on the parts and ends up in the rinse water. A test with a longer drip time or with cascade rinsing measures the saving in water and chemicals per part. If the change slows the line down, the cost of that lost capacity has to go into the comparison. We cover this in more detail in Surface treatment: spent baths, rinse water and metals.

4. Treatment plant sludge

A plant that removes 1,000 t a year of sludge at 20% dry solids would go down to about 667 t a year if it reached 30% with the same solids capture. In an illustrative scenario, at €120/t for disposal and with €8,000 a year of additional costs, the net saving would be around €32,000 a year. An upgrade installed for €40,000 would pay back in 15 months. Before investing, check the dryness with real sludge and measure the load that returns to the treatment plant with the filtrate. More figures in How to reduce sludge volume and what it costs to manage.

5. Reverse osmosis reject

A second membrane stage can reduce the flow reaching the evaporator. If the evaporator already exists, the benefit is calculated from the energy it no longer consumes and the value of the capacity freed up, provided the plant can use it. The test has to include periods of high salinity and account for cleaning and membrane replacement.

6. Concentrated brines

To assess crystallisation, compare the current cost of the tankers with the full cost of producing and removing a solid. The test has to establish its moisture, composition and disposal price. If the plan is to sell the salt, the income should only be counted when there is a buyer who accepts that quality and volume, as we explain in Brine management: turning waste into a raw material. That way the last stage can be assessed on its own without counting the upstream savings twice.

W

AUTHOR

WIZZUM engineering team

We design and commission wastewater and gas treatment installations for industry, from benchmarking and FEED engineering to start-up.

NEED HELP?

Want to know whether your stream allows that payback?

  • Comparative technical analyses
  • Design and delivery of turnkey installations
  • Environmental benchmarking and BAT analysis

Environmental engineering for industry.
Industrial wastewater, emissions and odors.

OFFICE

Avda. Cabrera, 36
08302 Mataró (Barcelona), Spain
info@wizzum.com

© 2026 Wizzum. All rights reserved.