Home / Blog / Industrial wastewater

INDUSTRIAL WASTEWATER

Cyanide and hexavalent chromium: why mixing everything in one sump is expensive

Cyanide, hexavalent chromium and metals are not treated in the same way. How to separate the streams from a plating line and in what order to treat them.

W
WIZZUM engineering teamPublished on 28/11/2026 · 6 min read

CONTENTS

IN SHORT

  • Cyanide and hexavalent chromium are treated separately, each in its own line, before they join the rest of the water.
  • Chemical precipitation removes the bulk of the metals. Ion exchange or adsorption only polish what is left.
  • Metal sludge and reverse osmosis reject need an authorised outlet from the first day of the project.

The treatment plant is not to blame

When a discharge analysis comes back bad at an electroplating shop, the first reaction is to look at the treatment plant: more reagent, a different flocculant, a filter at the end. The fault is hardly ever there. It is a few metres upstream, in the sump where waters that should never have met are combined.

A copper, nickel, zinc or chromium line does not produce “a wastewater”. It produces four or five, each with its own chemistry, and some are incompatible with each other. Treating them as one is expensive in reagents and sludge, and sometimes in fines as well.

Where the water comes from and what it carries

Water is used in degreasing, pickling and activation, in the rinses that follow each bath, in passivation and in the final wash. The rinses give the largest volume: lightly loaded water, but very variable from one hour to the next. Bath changes, equipment cleaning and floor washing give the opposite, low volume and high concentration, and they arrive all at once.

What the water carries depends on the line more than on the flow:

PollutantWhere it comes fromWhy it complicates treatment
Metals (Cu, Ni, Zn, Cr)Bath drag-out and rinsesDissolved or as fines; each metal precipitates best at a different pH
Hexavalent chromiumChromium plating and some passivation bathsIt does not precipitate as a hydroxide; it has to be reduced to trivalent chromium first
CyanideCyanide bathsToxic, and it forms complexes with metals that prevent them from precipitating
Acids and alkalisPickling, degreasing, neutralisationThey shift the pH and attack tanks, pipes and pumps
Oils and surfactantsDegreasingThey coat the flocs and spoil settling
Complexing agentsChelating agents in the baths, electroless nickelThey keep the metal in solution even when the pH is right
Suspended solidsMetal fines, bath sludgeThey overload settling and the filters

Five pipes are better than one

Mixing has specific consequences. If cyanide water meets acidic water, hydrogen cyanide, a lethal gas, is released inside the building. If chromium arrives together with other metals, each gets in the way of the others’ precipitation. If degreasing oil gets in, the sludge stops settling.

That is why the collection network is split at source:

  • cyanide waters,
  • chromium waters,
  • waters with metals in general,
  • acid and alkaline rinses,
  • oily waters from pretreatment.

Each stream gets its own treatment and only then joins the others. Ahead of the common treatment there is an equalisation tank, which absorbs the peaks in flow and concentration from batch rinsing. Without it, dosing is always one step behind what comes in.

The order of the stages

An electroplating treatment line almost always follows this sequence:

  • 1. Segregation and equalisation. Each bath and each rinse goes to its own collector according to the risk it carries.
  • 2. Oils and solids. Screening, grease separation, coagulation and settling or dissolved air flotation (DAF). This is done before touching the metals, because emulsified oil ruins everything that follows.
  • 3. Chemical pretreatment. Hexavalent chromium is reduced to trivalent in acidic conditions, usually with bisulphite. Cyanide is destroyed by oxidation in alkaline conditions, in its own reactor. The pH is then adjusted and the metals are precipitated.
  • 4. Solid-liquid separation. Settling, flotation or filtration. The sludge is thickened and dewatered.
  • 5. Polishing and reuse. Only if the discharge limit or the quality of the water to be recovered requires it.

The precipitant in step 3 is chosen with the analysis in front of you. Hydroxide (lime or caustic soda) is the usual choice, but there is no single pH that works for every metal: nickel needs a higher value than copper, and zinc and chromium redissolve if you overshoot. With complexing agents in the water, hydroxide falls short and you have to move to sulphides or organosulphide precipitants.

Precipitation is not polishing

There is one approach worth ruling out early: a resin column or a selective adsorbent filter used as the main solution for a heavily loaded effluent. It does not last. The resin is exhausted, regenerations multiply and the cost per cubic metre stops making sense.

Chemical precipitation is there to take out the bulk of the load. It turns most of the dissolved metal into a solid that settles, and its performance depends on pH, on complexing agents and on how well the sludge is separated. Polishing (precipitation with chelating agents, adsorption, ion exchange) is sized for the small residue left afterwards.

Something similar happens with reverse osmosis. It allows water to be recovered for the rinses, but it needs a pretreatment that protects the membranes and it produces a concentrated reject that has to be managed. If that reject has no outlet (an evaporator, an authorised waste contractor), reuse stays on paper. What to do with spent baths and when to evaporate is covered in Surface treatment: spent baths, rinse water and metals.

What tends to be left until the end

Four matters rarely come up at the first meeting and then shape the project.

The sludge. Metal sludge may be classified as hazardous waste. Its collection, dewatering and waste contractor are confirmed against local regulations before the filter press is sized.

The materials. Acids, alkalis, chlorides and sulphides decide what tanks, pipes, pumps and filters are made of. They are specified for the worst possible chemistry, which is usually an accidental bath spill.

The records. Dosing, pH, residual metal and sludge leaving the site. They serve the inspector, and they let the operator see a deviation before it reaches the official analysis.

The tests. The factory test checks that the equipment works before it is shipped. It says nothing about the discharge. Acceptance takes place on site, with the real water, the finished installation and the site’s operating conditions. In the contract it is best to make them two separate milestones.

Where to start

  • Draw the map of the line: each bath and each rinse, assigned to one of the five water categories.
  • Analyse real samples of rinses and bath dumps: metals, the form of the chromium, cyanide, pH, oils, complexing agents and solids.
  • Decide where the water is going. Discharge to sewer, internal reuse or process-quality water call for different polishing and membranes. Note the limits that apply to you.
  • Size for the peaks. Collectors, equalisation, dosing and separation are calculated for the day of a bath change, which is when everything is put to the test.
  • Choose materials for the worst case.
  • Secure the outlet for the sludge and the membrane reject with an authorised waste contractor.
  • Allow for sampling points, dosing records and access for maintenance.

Tell us which baths you have, which metals show up in your latest analysis and whether you want to discharge or reuse. With that information we can tell you which streams to separate and which stages you need.

Frequently asked questions

Can I treat all the water from the line in a single reactor?+

Only if there are no cyanide baths and no hexavalent chromium. If there are, each needs its own pretreatment before mixing: cyanide destruction takes place in alkaline conditions and chromium reduction in acidic conditions, so they cannot share a tank.

Why do I still have nickel or copper in the discharge if the pH is right?+

Most likely there are complexing agents. The chelating agents in some baths keep the metal dissolved at any pH. They have to be identified in the analysis, and then you either change the precipitant or break the complex before precipitating.

Is it worth reusing the water with reverse osmosis?+

It depends on the price of water, on discharge charges and on what it costs to manage the reject. Technically it works if the pretreatment is good. Before deciding, the outlet for the concentrate has to be settled.

W

AUTHOR

WIZZUM engineering team

We design and commission wastewater and gas treatment installations for industry, from benchmarking and FEED engineering to start-up.

NEED HELP?

Do you have a line with cyanide or chromium and a discharge that fails its limits?

  • Comparative technical analyses
  • Design and delivery of turnkey installations
  • Environmental benchmarking and BAT analysis

Environmental engineering for industry.
Industrial wastewater, emissions and odors.

OFFICE

Avda. Cabrera, 36
08302 Mataró (Barcelona), Spain
info@wizzum.com

© 2026 Wizzum. All rights reserved.