Measure first, then design: what emission data a treatment installation needs

A treatment installation is designed from emission data. What to measure, for how long, and which mistakes make the unit too expensive or leave it undersized.

W
WIZZUM engineering teamPublished on 11/06/2024 · 7 min read

CONTENTS

IN SHORT

  • Most installations that perform poorly have no manufacturing defect. They were designed with data that did not match the real emission.
  • For the design, you need to measure over a full production cycle: average concentration, peaks, shutdowns and operating hours.
  • When there are odor complaints, measuring VOCs is not enough. Olfactometry and analysis of specific compounds are needed.

Most emission treatment installations that perform poorly have no manufacturing defect. They were designed with data that did not match the real emission: with the flow rate from the fan nameplate, with a concentration measured on a low-production day or with a composition nobody checked. A good measurement costs little compared with redoing a finished installation.

What needs to be measured

This is the data any engineering firm needs to size a VOC treatment installation and compare the options with numbers:

ParameterWhat it is for
Flow rate (Nm³/h)Size of the unit, fan and ductwork
Gas temperatureCondensation, choice of materials, energy required
HumidityEfficiency of activated carbon and zeolite, risk of condensation
Total organic carbon (TOC)VOC load and oxidizer energy use
VOC compositionCompounds that destroy catalysts or form acids
CO and NOxWhen there is combustion in the process or in the existing unit
Dust and aerosolsNeed for prefiltration
OxygenCorrection of results and process safety

TOC is normally measured continuously with a flame ionization detector (FID) analyzer. It gives the total load of organic compounds expressed as carbon, which is what the oxidizer designer needs. Specific compounds are determined in samples analyzed in the laboratory.

How long to measure

A one-hour measurement is enough to check whether the source meets the limit. For design purposes it is not enough. The emission changes with the product being made, the shift, line cleaning and the time of year. It is best to measure a full production cycle and, if the products are very different, to measure each one.

We look for four things:

  • the average concentration, which determines day-to-day energy use;
  • the peak concentration, which determines safety and the unit’s capacity;
  • the periods when the concentration falls almost to zero, because the installation is then running “empty”;
  • the operating hours of each source per year.

With these four figures, the annual energy consumption of each technology can be calculated. That is precisely what sets one option apart from another.

The data the plant already has

Before measuring, it is worth gathering what already exists:

  • Solvent consumption: annual purchases of paints, inks, adhesives and cleaning products, with their safety data sheets. They make it possible to estimate how many VOCs go up the stack and which compounds they are.
  • Previous measurements: reports from periodic emission measurements give a first picture of the concentrations, although on their own they are not enough for the design.
  • Extraction layout: which machines are connected to which source, with which fans and nominal flow rates.
  • Production plans: if the line is going to be expanded, the installation has to be sized for the final situation.

Mistakes that drive up the cost of the project

Sizing for the fan’s nominal flow rate. Fans rarely work at their nominal point. A unit designed for a higher flow rate than the real one is more expensive to buy and to keep at temperature.

Diluting to meet the limit. Adding clean air lowers the concentration at the stack, but increases the flow to be treated. On top of that, the diluted emission usually ends up below the point at which the oxidizer runs without fuel.

Combining sources without analyzing them separately. Joining a paint booth and an oven into a single installation can make sense, but it can also mean treating a lot of air with little load. Each source has to be measured separately before deciding.

Forgetting what isn’t VOCs. Silicones, chlorinated compounds, dust or aerosols change the choice of technology or call for pretreatment stages. If nobody measures them, they show up later: as a poisoned catalyst, a blocked bed or corrosion.

When the problem is odor

When there are odor complaints, measuring VOCs is not enough. Many odorous compounds, such as H₂S, mercaptans or amines, can be detected at concentrations in the ppb range, far below the threshold of a TOC analyzer or a portable detector. Other methods are needed:

MethodWhat it gives
Dynamic olfactometry (EN 13725)Odor concentration of each source in ouE/m³; combined with the flow rate, it gives the odor emission
Chemical analysis of specific compoundsSulfur compounds, amines, fatty acids or specific VOCs, with a limit of quantification below the odor threshold
Field inspection (EN 16841)Whether the odor reaches the surrounding area, how often and where

The rules for good sampling are the same as for VOCs, with a few additions:

  • take samples under the worst reasonable conditions: during unloading, filling, cleaning and on hot days;
  • separate ducted sources from open surfaces, such as tanks or buildings, because they are measured differently;
  • record the process status, open doors, wind and temperature for each sample;
  • analyze the samples quickly, because sulfur compounds degrade in the bag within a few hours;
  • dilute very hot, humid or corrosive gases during sampling.

A practical tip: if the laboratory reports “not detected”, check that the limit of quantification is below the odor threshold. If it isn’t, the compound may still be smelled even though the report says it isn’t there. We discuss the test itself further in the article on olfactometry tests.

An example: why it matters

Take a line with an extraction rate of 20,000 Nm³/h and an average VOC concentration of 1.5 g/Nm³. That is around 30 kg of VOCs per hour, enough for an RTO to run almost without fuel.

Now suppose that, to lower the concentration at the stack, an additional air inlet is opened and the flow rate rises to 40,000 Nm³/h. The VOCs are the same, 30 kg/h, but the concentration drops to 0.75 g/Nm³. The RTO has to be twice as large and needs gas continuously to hold its temperature. The emission has not changed; the cost of treating it has.

The opposite also happens. If the measurement was made on a low-production day and the real concentration is double, the unit may operate above its thermal capacity, with high-temperature trips and line stoppages. In both cases the cause is the same: a design done without knowing the emission well.

What the measurement report should include

For the report to be useful to the designer, it has to go beyond the average value required in an inspection. It should include:

  • concentration graphs from the continuous measurement, not just the average;
  • the flow rate at each measuring point and the reference conditions;
  • what the plant was producing at each moment;
  • the laboratory results for specific compounds;
  • incidents: shutdowns, cleaning, product changes.

With the emission properly described, two or three technologies can be compared using the same data: investment, annual energy use, maintenance and footprint. Our article on how to choose a VOC treatment technology gives a first steer by flow rate and concentration, and we describe the scope of our measurements in the piece on air and gas measurements.

Frequently asked questions

Is a periodic emission measurement enough to design an installation?+

Usually not. A compliance measurement is short and shows whether the source meets the limit. For the design, you need a record of how the concentration changes over a full production cycle.

How long should a measurement campaign last?+

As long as a full production cycle. If there are several different products, it is worth measuring each one, because each gives a different emission.

Who carries out the laboratory analyses?+

The samples are analyzed by an independent accredited laboratory. We plan the measurements, supervise the sampling and interpret the results with the design in mind.

W

AUTHOR

WIZZUM engineering team

We design and commission wastewater and gas treatment installations for industry, from benchmarking and FEED engineering to start-up.

NEED HELP?

Do you want to measure the emission before choosing the installation?

  • Comparative technical analyses
  • Design and delivery of turnkey installations
  • Environmental benchmarking and BAT analysis

Environmental engineering for industry.
Industrial wastewater, emissions and odors.

OFFICE

Avda. Cabrera, 36
08302 Mataró (Barcelona), Spain
info@wizzum.com

© 2026 Wizzum. All rights reserved.